OEM/ODM Factory Man Lift Platform - Electric Assisted Walking Brig Aluminum Man Lift – Heshan
OEM/ODM Factory Man Lift Platform - Electric Assisted Walking Brig Aluminum Man Lift – Heshan Detail:
The auxiliary walking double-column aluminum alloy lifting platform is a new generation of updated products. The whole is made of high-strength aluminum profiles. Due to the high strength of the profiles, the deflection and swing of the lifting platform are extremely small. It adopts double mast structure, which has large load capacity, large platform area, excellent stability, flexible operation, and lighter battery-assisted walking. Its lightweight appearance enables high lift capacity in a very small space. The new product battery-assisted walking aluminum alloy lift is widely used in factories, hotels, buildings, shopping malls, stations, airports, stadiums, etc. It can be used for installation and maintenance of power facilities, building decoration, overhead pipelines, etc., and high-altitude operations for one or two people such as high-altitude cleaning.
Scope of application
The aluminum alloy aerial work platform is suitable for the repair, maintenance and cleaning of shopping malls, hotels, restaurants, interior decoration, layout, space light lines, pipelines, doors and windows, and is suitable for space operations in rooms with narrow areas or spaces.
Name |
Model No. |
Max.Platform Height(M) |
Load Capacity(KG) |
Platform Size(M) |
Voltage (V) |
Power(KW) |
Net Weight(KG) |
Overall Size(M) |
Dual Mast |
DMA6-2 |
6 |
250 |
1.38*0.6 |
custom |
1.5 |
480 |
1.45*0.88*1.75 |
DMA8-2 |
8 |
250 |
1.38*0.6 |
1.5 |
560 |
1.55*0.88*2.05 |
||
DMA9-2 |
9 |
250 |
1.38*0.6 |
1.5 |
620 |
1.55*0.88*2.05 |
||
DMA10-2 |
10 |
200 |
1.38*0.6 |
1.5 |
680 |
1.55*0.88*2.05 |
||
DMA12-2 |
12 |
200 |
1.48*0.6 |
1.5 |
780 |
1.65*0.88*2.05 |
||
DMA14-2 |
14 |
200 |
1.58*0.6 |
1.5 |
980 |
1.75*0.88*2.25 |
Instructions
1. Open the support arm to 135° before operation (see the picture), rotate the outrigger wire cylinder, adjust the base to the level, fasten the safety rope, check whether the travel switch is firm and sensitive, and whether the upper control button is normal, it can be operated When the platform is lifted and raised to the working height, the staff must wear a safety belt and lock it on the body and solid objects.
2. Lifting operation: It is divided into upper and lower control lifting and flashlight dual-purpose. Operate according to the marked symbol. Check whether the hand pressure valve is closed before use. low position.
3. When the elevator is operating, the diameter of the power cord should not be less than 4 square mm, and the length should not exceed 20 meters.
4. Do not drop items into the chute during operation.
5. Overload operation is not allowed.
6. The lift is not lowered to the low position, and it is not allowed to move the whole machine.
7. Outdoor work is prohibited in windy and rainy weather.
Details
Factory Show
Cooperative Client
Product detail pictures:
Related Product Guide:
We stay with the basic principle of "quality initially, services first, steady improvement and innovation to fulfill the customers" for your management and "zero defect, zero complaints" as the quality objective. To perfect our company, we give the goods while using the good high-quality at the reasonable selling price for OEM/ODM Factory Man Lift Platform - Electric Assisted Walking Brig Aluminum Man Lift – Heshan , The product will supply to all over the world, such as: European, Hyderabad, London, You can always find the solutions you have to have in our company! Welcome to inquire us about our product and anything we know and we can help in auto spare parts. We have been looking forward to work with you for a win-win situation.
By Meroy from Guinea - 2018.10.31 10:02
The factory technical staff not only have high level of technology, their English level is also very good, this is a great help to technology communication.
By Lee from Nairobi - 2017.09.09 10:18